I had some extra melamine, so I (somewhat hastily) cut a new base for the Laguna Rotary. It’s not yet installed, and it needs some holes drilled for the T-nuts. It’s currently sitting under the rotary. At some point I’ll finish this, but if anyone wants to install it feel free. Hopefully I got the measurements correct.
It’s a bit wider so it covers most of section A, although it’s probably going to be a rare day you could use it with only the vacuum
Thanks for make that Al! Happy to install it. Which way did you design the wider side(the cut-out is not centered) to orient? Towards the back wall or towards the operator?
I think it only goes one way due to how the holes are drilled. I meant for the rotary to be closest to the operator, but it could be used either way. I only made small predrilled holes, so that one could manually come through with a Forstner bit on the bottom side, to make a clearance cut for the face of the t-nuts. After that, then go through and make a larger clearance hole all the way through.
Al, the pocket wasn’t quite big enough(shy on length and width about a 1/16". I chiseled it out and it fits now. It’s not beautiful but I think it will work. Melamine doesn’t like to be chiseled.
We might want to cut a new one then. It’s critical that the rotary axis be aligned to the edge of the melamine. A tight fit in the pocket allows it to reigster against the metal base of the rotary.
Al, if you recut it, please don’t cut the secondary center cut out. The original bed doesn’t have it and the material gets very thin when the counter sinks for the T Nuts are cut. Thanks.