We have started AC repairs and replacements. During this week, and possibly into next week, the AC unit near the two band saws will be completely replaced, and will require the bandsaws to be moved and disconnected during the installation. Two other units are also being worked on and will require equipment underneath them to be taken offline for periods of time yet unknown.
Work is being done during the day, sometime into the early evening usually between 8am - 7pm. If you schedule before or after you should have the best opportunity to not have issues.
Sorry for the inconvenience, but I think we are all grateful to have an air conditioned space to rely on.