It was recently discovered that the MPR water fountain has had some internal leaking for some time now. This coupled with the leak underneath the kitchenette cabinet last year has convinced Sarah and I that it is finally time for a revamp of this area. We are looking to move very quickly on this and looking for bids for a few pieces of this project. Volunteers are most certainly welcome, however we are willing to work with folks to entice a timely finish.
Jobs
- Cabinets (3 base cabinets) Building. All are 33", one with 3 drawers, one for a sink, the third with two doors and a drawer. Plywood preferred.
- Cabinets Install (with sink)
- Plumbing (Water to fridge, water to bottle filler, plumbing to sink and bottle filler
- Electrical (ensuring good connections to appliances).
- Backsplash Install
- Ceramic Backsplash creation? Roughly 36" x 100" area.
If you are interested, please reach out to Facilities@asmbly.org as soon as you can. We are looking to start demo in 1-2 weeks time and build immediately following.
For those following at home that means the MPR water fountain will be down until this is done.