A new HVAC will be coming to replace the one over the hallway by the metal shop, Ceramics, and studio spaces.
A crane will need to be used to lift that HVAC onto the roof. Expect limited parking availability tomorrow morning, May 6th between 10:00 a.m. and 1:00 p.m.